News

Search

Select a Date Range

JOINT ADVISORY - Simulated hazmat emergency exercise to take place September 25 in New Tecumseth

Posted on Friday, September 19, 2025 09:41 AM

Simulated hazmat emergency exercise to take place September 25 in New Tecumseth

Midhurst/September 19, 2025 – The County of Simcoe and Town of New Tecumseth are advising the community of Alliston that there will be a staged emergency exercise on September 25, 2025 at the CPKC Spence Pre-Tripping Facility, located just west of the 11th Line and Tottenham Road intersection near Alliston. This exercise will help emergency personnel learn, practice, and test the coordination of emergency services on...

Road Closure on Nolan Road

Posted on Thursday, September 18, 2025 03:00 PM

Please be advised that Nolan Road, between Tottenham Road and 10th Sideroad in Tottenham, will be temporarily closed to facilitate emergency railway crossing repairs.

Closure Details:

  • Start: September 22 at 9 AM
  • End: September 23 at 8 PM

Motorists are advised to plan alternate routes and allow for additional travel time during this period.

We appreciate your patience and cooperation as these essential repairs are completed.

For updates, please visit newtecumseth.ca/roadclosures

Road Closure on 11th Line - September 25

Posted on Thursday, September 18, 2025 09:24 AM

Please be advised that 11th Line, between Tottenham Road and Adjala-Tecumseth Townline, will be closed on September 25 from 7 AM to 4 PM.

This temporary closure is necessary to accommodate an Emergency Services Exercise taking place in the area. The exercise is part of ongoing efforts to enhance emergency preparedness and response capabilities within our community.

What to Expect:

  • No through traffic will be permitted during the closure period.
  • Detour signage will be in place to assist drivers.
  • Local...

Notice of Road Construction – 15th Line

Posted on Monday, September 15, 2025 02:15 PM

The Town of New Tecumseth has awarded a road improvement project for 15th Line, between 18th Sideroad and the Town border with Bradford West Gwillimbury, to Lisbon Paving Co. Ltd.

The construction will include:

  • Removal of existing asphalt
  • Regrading of the gravel roadway
  • Repaving of the road surface
  • Application of new road markings
Construction Timeline

Work is scheduled to begin as on September 22, 2025.

Traffic & Access
  • During working hours: One lane of vehicular traffic will be maintained, along with...