14th Line and C.W. Leach Municipal Class EA
Background
The Town of New Tecumseth has identified a need to evaluate options for improvements to 14th Line from Industrial Parkway / County Road 10 to Sideroad 10, including the Mayberry Bridge, and improvements to the C.W. Leach Road corridor from 14th Line to Highway 89 to accommodate anticipated increases in traffic as a result of ongoing and planned residential and industrial developments in the area.
Scope of Work
The Town hired R.J. Burnside and Associates Limited to complete a Municipal Class Environmental Assessment and preliminary design of the road improvements. The study will consider a wide range of multi-modal transportation improvements, including road widening, bridge replacement, cross-sectional requirements, active transportation, intersection improvements, and overall traffic operations and safety.
The impacts of the transportation improvements on the social, cultural, and natural environments will be assessed and evaluated through the study.
The Town will also ask for feedback from the public, Indigenous Nations, government groups, and others. Two public meetings will be held so people can learn more and share their thoughts.
This study will follow the Municipal Class Environmental Assessment process (Municipal Engineers Association, 2024), as a Schedule C project, which is an approved process under the Ontario Environmental Assessment Act.
Contact Information
We want to hear your thoughts about this project. The Town would like to ensure that anyone interested in this study has the opportunity to provide input into the planning and design of the project. At this time, the Town is inviting public input on local issues and the alternatives being considered. Please contact the project team members below if you have questions, comments, or want to be on the Project Contact List to receive notices about the project.
Project Consultant:
Drew Davidge, P.Eng.
Project Manager
R.J. Burnside & Associates Limited
128 Wellington Street West, Suite 301
Barrie. Ontario, L4N 8J6
Tel: 705-797-4358
Email: Drew.Davidge@rjburnside.com
Town Project Manager:
Joel John-Ogbe, EIT.
Project Manager, Capital Engineering
Town of New Tecumseth
24 Tupper Street West
Alliston, Ontario, L9R 1H2
Office: 705-415-3045
Email
Project information will be updated as it becomes available.
|
Study Area |
||
|
|
||
|
Anticipated Project Timeline |
||
|
|
||
| Project Updates and Notices | ||
| Public Information Centres (PIC) | ||
|