King St. S. and Industrial Parkway Intersection Improvements

King Street South and Industrial Parkway Intersection Improvements 

The Town of New Tecumseth has retained Triton Engineering Services Limited to undertake the design for improvements at the King Street South and Industrial Parkway intersection.

The project includes extending the sidewalk on the east side of King Street South and Adjala Tecumseth Townline, and upgrading traffic signals with pedestrian features.

Design work begins in November 2025 and is expected to finish by July 2026. Field investigations, including surveys and small road tests, will start soon and finish by January 2026. 

Project Updates and Notices

November 10, 2025 - Notice of Start of Project

Project Maps

Location Map

A picture of a map. 

Frequently Asked Questions

 

Will access to my property be needed?

Access is not anticipated at this time. If access is needed, a permission to enter (PTE) will be requested prior to any access.

What are the paint marks on the road and sidewalk?

Paint marking and flags in various colours identify the location of buried utilities that will assist with the design and ultimately the construction work. 

Why are they doing drilling into the road?

Borehole investigation is a drilling process that provides a sample below the surface to determine the type, thickness, and suitability of the existing asphalt, road base, subbase, and soil materials including determining groundwater conditions.

When is construction planned?

Construction is tentatively planned for summer 2027, pending budget approval.

 Should you have any questions or concerns related to this project, please contact the following:

Project Engineer

Taylor Kramp, P. Eng.
Triton Engineering Services Limited
71 Broadway, Unit 4
Orangeville, ON, L9W 1K4
Tel: 519-941-0330 ext. 224
tkramp@tritoneng.on..ca

Town of New Tecumseth

Frank Craparotta, C.E.T., rcji
Project Manager
24 Tupper Street West
Alliston, ON, L9R 1H2
Tel: 705-415-3096
Email