Alliston Connecting Link Intersection Improvements MCEA
The Town of New Tecumseth has initiated a Municipal Class Environmental Assessment (MCEA) to assess the need for improvements to the Victoria Street West, Young Street, Albert Street and King Street intersections within the Alliston Connecting Link.
The study will examine existing and future transportation conditions, including the existing 300-metre jog along King Street, which interrupts the otherwise continuous east-west
connection of Highway 89. Alternative solutions will be developed and evaluated to identify opportunities to improve safety, efficiency, connectivity and the way people move through the corridor, including by vehicle, on foot, by bicycle and by transit.
The study will follow Schedule C of the Municipal Class Environmental Assessment process. Environmental, social, cultural, technical and financial factors will be considered, along with input from the public, agencies, Indigenous communities and other stakeholders.
Your input is important
The Town is inviting input on local issues, transportation needs and the alternatives being considered. No preferred solution has been selected at this stage.
To submit a comment or question, or to join the project contact list, contact:
Frank Craparotta, C.E.T., rcji,
Project Manager, Town of New Tecumseth
Phone: 705-415-3096
Email: FCraparotta@newtecumseth.ca
Taylor Kramp, P.Eng.,
Project Manager, Triton Engineering Services Limited
Phone: 519-941-0330 ext. 224
Email: tkramp@tritoneng.on.ca
Public Information Centres are planned during future stages of the study. Details will be provided once they are finalized.
Contact Frank Craparotta at 705-415-3096 or FCraparotta@newtecumseth.ca, or Taylor Kramp at 519-941-0330 ext. 224 or tkramp@tritoneng.on.ca to join the Project Contact List.
Contact Frank Craparotta at 705-415-3096 or FCraparotta@newtecumseth.ca, or Taylor Kramp at 519-941-0330 ext. 224 or tkramp@tritoneng.on.ca to submit a comment.
It is a planning study to assess potential improvements at the Victoria Street West, Young Street, Albert Street and King Street intersections within the Alliston Connecting Link.
The Town is examining existing and future transportation conditions and opportunities to improve safety, efficiency, connectivity and multi-modal functionality.
A Municipal Class Environmental Assessment is a structured planning and decision-making process for municipal infrastructure. It includes defining the problem or opportunity, evaluating alternatives, consulting with interested and affected parties, and documenting the study.
Schedule C studies address projects that require a more detailed review of alternative solutions and design concepts, supported by consultation and an Environmental Study Report.
The study includes the Victoria Street West, Young Street, Albert Street and King Street intersections shown on the approved study-area map.
The existing approximately 300-metre jog along King Street interrupts the otherwise continuous east-west connection of Highway 89. The study will consider this condition as alternatives are developed and evaluated.
No. The study is beginning. Alternatives will be developed and evaluated before a preferred solution is identified.
No. This is a study commencement notice. Future design, approvals, funding and construction steps would follow separately.
The study will consider environmental, social, cultural, technical and financial factors, along with stakeholder and public input.
No site-specific access changes have been confirmed at study commencement. If potential access impacts are identified, affected property owners and businesses will be contacted directly.
Property requirements have not been confirmed. Where potential property needs are identified, the Town and project team will consult directly with affected owners.
Yes. Natural environment conditions and potential impacts will be considered through the study and alternatives evaluation. The Town recognizes that the “Sitting Duck” is a historic, roughly 250 to 300-year-old Bur Oak tree located at the intersection of King and Young Streets in Alliston, within the immediate study area. The presence and significance of this tree will be duly considered and integrated into all phases of the MCEA, including evaluation, design, and decision-making.
You can contact either project manager, ask to join the project contact list, participate in future Public Information Centres, and use any survey or comment tools posted on the project webpage.
Local observations about safety, access, walking, cycling, transit, traffic operations, deliveries, emergency response, neighbourhood conditions and potential impacts are helpful.
Comments will be documented, reviewed by the project team and considered during the evaluation of alternatives and development of the preferred solution.
With the exception of personal information, comments will form part of the public record for the study.
Public Information Centre details and future notices will be posted on the project webpage and promoted through Town channels. People on the project contact list will receive future notices.
The anticipated completion date for the study is Q4 of 2028. The webpage will be updated as the study progresses.
Contact Frank Craparotta at 705-415-3096 or FCraparotta@newtecumseth.ca, or Taylor Kramp at 519-941-0330 ext. 224 or tkramp@tritoneng.on.ca.