New Tecumseth Water Transmission Main Booster Pumping Stations Municipal Class Environmental Assessment

September 25, 2026

Background

The Town of New Tecumseth (Town) owns and operates a 57km long water transmission main that conveys treated water from the Raymond A. Barker Water Treatment Plant (RAB WTP) in Collingwood to the Parsons Road Reservoir in Alliston, with additional supply connections to New Lowell, Baxter and Angus.

In 2016, the Town completed a Water Supply, Distribution and Storage Master Plan which identified the preferred strategy to provide security of water supply and to accommodate growth needs in Alliston, Beeton and Tottenham. The Master Plan identifies the need for two new Booster Pumping Stations on the New Tecumseth water transmission main.

The water transmission main was designed with provisions for future connection of up to four booster pumping stations. The addition of Booster Pumping Station #1 (BPS#1) is required to increase capacity in the short term and is being planned in coordination with the RAB WTP Expansion. Booster Pumping Station #2 (BPS#2) will be required to increase capacity in the longer term, based on water demand as identified in the Master Plan.

Scope of Work

The Town is undertaking a Schedule B Municipal Class Environmental Assessment (MCEA) for the addition of BPS#1 and BPS#2. Alternative solutions will be evaluated to identify preferred alternatives for the proposed booster pumping stations, including site options for BPS#1 and BPS#2 within the hydraulic constraints of the water transmission main. This project is being planned in coordination with Simcoe County, Clearview Township and the Township of Essa.

The study areas for BPS#1 and BPS#2 are at the following general locations (refer to Figures 1-3):

  • BPS#1: Concession Road 7 Sunnidale and Barrie-Collingwood Rail Trail (Clearview Township)
  • BPS#2: County Road 10 and Side Road 25 (CFB Borden / Township of Essa)

Contact Information

Consultation is a key element of a Municipal Class Environmental Assessment. For further information or to be added to the contact list to receive future project notices, please contact the project team at the email address below.

Project Consultant:

Beth Rodgers, P.Eng.
Project Manager
R.V. Anderson Associates Limited
Email: NTPipelineBPS_EA@rvanderson.com

Town Project Manager:

Joel John-Ogbe, EIT.
Project Manager, Capital Engineering
Town of New Tecumseth
Email

 Project information will be updated as it becomes available.

Study Area
A picture of three maps. The top map shows the approximate location of Booster Pumping Station number one and Booster Pumping Station number two. The bottom left map shows the proposed Booster Pumping Station number one study area within the Township of Clearview. The bottom right map shows the proposed Booster Pumping Station number two study area in the Township of Essa / CFB Borden.

Recent Projects

Loading...

Loading...

Contact Form

Please enter your email address, subject and message, and click the "Send Email" button. If your request requires follow-up, please be sure to include your full name, day-time phone number and any relevant address information in the text of your email message

This field is for validation purposes and should be left unchanged.