Posted Tuesday, July 19, 2022
Shoulder Maintenance Program
Public Works’ Shoulder Maintenance Program begins July 20 which helps improve road drainage and reduce shoulder drop-offs and vegetation. Once the shoulder has been reclaimed, material is left loose to dry out and is regraded within a few days. More https://bit.ly/3OchAg8.
Please exercise caution travelling on the following roads while works are being completed:
Adj-Tec Townline (Industrial Pkwy to CR 1)
Church St (Industrial Pkwy to Beech St)
Industrial Pkwy (NTRC to Preston Ave)
Sideroad 10 (14th Line to HWY 9)
Sideroad 15 (11th Line to HWY 9)